{"id":16158,"date":"2021-06-04T21:09:36","date_gmt":"2021-06-04T21:09:36","guid":{"rendered":"https:\/\/www.qps.ca\/?page_id=16158"},"modified":"2021-09-13T19:50:15","modified_gmt":"2021-09-13T19:50:15","slug":"table-19","status":"publish","type":"page","link":"https:\/\/www.qps.ca\/fr\/table-19\/","title":{"rendered":"(English) 2021 Changes In The Canadian Electrical Code: Table 19"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text][vc_row][vc_column][vc_column_text]<\/p>\n<h5>Changes in the 2021 Canadian Electrical Code Part I (CE Code) &#8211; By Steve Douglas<\/h5>\n<h4>This is the second of a series of articles detailing significant changes for the 2021 Canadian Electrical Code Part I (CE Code) that may impact electrical equipment manufacturers. A full copy of the CE Code is available at https:\/\/www.csagroup.org\/store\/<\/h4>\n<p>The new Table 19 is easier for manufacturers to help establish an acceptable application for installation cables.\u00a0 \u00a0Table 19 was first introduced into the CE Code in the Sixth Edition Published in 1953. The first Table 19 was an expansion of Table 1 from the 1947 CE Code that was limited to Conductor Designation, Type, and Maximum Allowable Temperature. In the 1953 edition, Table 19 reference rules in Sections 12 only. In the 1958 CE Code Table 19 was expanded to include Conditions of Use, and Trade Designation, and to include rule references for Sections 4, 12, 16, 22, 26, 34, 36, and 38. Over the years more references were added as the table grew, resulting in the table referencing seventeen sections of the code in the 2009 Edition.\u00a0 Between the 2009 and 2018 Editions of the CE Code rule references were moved to Section 12.\u00a0 This change gave Section 12 the responsibility to maintain Table 19.\u00a0 For the 2021 CE Code development cycle, a task group was established by the Section 12 Chair. This task group met once a month over eighteen months to develop a new Table 19.\u00a0 The new Table 19 is easier to use, accurate, smaller, and has no notes.\u00a0 The task group reviewed each insulated conductor and cable type for accuracy, and missing types and applications.\u00a0 In addition, all of the 37 notes were removed.<\/p>\n<p>Some of the notes were moved to rules in the body of the code, some were moved to Appendix B notes, and the rest were deleted as out-of-date references. One great outcome is that all the information for any type of insulated conductors or cables is located on a single page, making the table much easier to use.<\/p>\n<p>As an example, all of the information for insulated conductors, such as RW90, can be found on the first page of the new Table 19.\u00a0 Table 19 now has eight pages as follows:<\/p>\n<ul class=\"common\">\n<li>Thermoset insulated conductor, Thermoset cable, Thermoplastic insulated conductor and Thermoplastic cables.<\/li>\n<li>Non-metallic sheathed cable, and Cables not having a metal armour or metal sheath.<\/li>\n<li>Cables not having a metal armour or metal sheath, and Extra-low voltage cables not having a metal armour or metal sheath.<\/li>\n<li>Fire alarm and signal cable.<\/li>\n<li>Cables having metal armour or metal sheath.<\/li>\n<li>Cables having metal armour or metal sheath, and 5 kV to 46 kV shielded power cable unarmoured and 5 kV to 46 kV shielded power cable armoured.<\/li>\n<li>Communications cables and Communications cable with limited power.<\/li>\n<li>Communications cables.<\/li>\n<\/ul>\n<figure id=\"attachment_4624\" aria-describedby=\"caption-attachment-4624\" style=\"width: 1024px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4624\" src=\"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png\" alt=\"\" width=\"1024\" height=\"637\" \/><figcaption id=\"caption-attachment-4624\" class=\"wp-caption-text\">Table 19 &#8211; First page of the new Table 19<\/figcaption><\/figure>\n<p style=\"text-align: center;\"><em><strong>The task group is not finished, we are now working on Tables 11 and D1 with the plan to have revisions for these tables ready for the 2024 CE Code.<\/strong><\/em><\/p>\n<h6>The Table 19 Task Force members are:<\/h6>\n<p>S. Douglas (Chair), E. Cometa, S. Hall, D. Harris, L. Letea, I. Muller, K. Richards, A. Singh<\/p>\n<p>&nbsp;[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]&nbsp;<\/p>\n<p><a href=\"https:\/\/www.qps.ca\/services\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-11378 aligncenter\" src=\"https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/04\/Button-CLICK-HERE-TO-LEARN-MORE-ABOUT-QPS-AND-OUR-SERVICES-300x70.jpg\" alt=\"\" width=\"300\" height=\"70\" srcset=\"https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/04\/Button-CLICK-HERE-TO-LEARN-MORE-ABOUT-QPS-AND-OUR-SERVICES-300x70.jpg 300w, https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/04\/Button-CLICK-HERE-TO-LEARN-MORE-ABOUT-QPS-AND-OUR-SERVICES-768x179.jpg 768w, https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/04\/Button-CLICK-HERE-TO-LEARN-MORE-ABOUT-QPS-AND-OUR-SERVICES.jpg 950w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;[\/vc_column_text][vc_separator color=\u00a0\u00bbblack\u00a0\u00bb border_width=\u00a0\u00bb2&Prime;][\/vc_column][\/vc_row][vc_row][vc_column][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text][\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<h3><strong><span style=\"color: #ff0000;\">about the author<\/span><\/strong><\/h3>\n<p><em><span style=\"color: #ff0000;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-14200 size-medium\" src=\"https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/05\/Steve-Douglas-14-300x296.png\" alt=\"\" width=\"300\" height=\"296\" srcset=\"https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/05\/Steve-Douglas-14-300x296.png 300w, https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/05\/Steve-Douglas-14-768x758.png 768w, https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/05\/Steve-Douglas-14-100x100.png 100w, https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/05\/Steve-Douglas-14.png 1003w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Steve Douglas<\/span> is an IAEI International Past President. He is also the Senior Technical Codes Specialist for QPS Evaluation Services. As the International Association of Electrical Inspectors Representative on Part I and Part II of the Canadian Electrical Code, Steve is the Immediate Past Vice Chair of the CE Code Part I, Chair of CE Code Part I Subcommittees for Section 2, and 12, and a member on Sections 8, 40, 64, 68, 76 and Appendix A. In addition Steve is the Chair of the Subcommittees for the CSA Standards C22.2 No. 273 Cablebus, C22.2 No. 327 HDPE Conduit, C22.6 No. 1, Electrical Inspection Code for Existing Residential Occupancies committee, SPE-1000 Subcommittee, the Chair of the Technical Committee on Wind Turbines, and a member on committees for the Objective Based Industrial Electrical Code, Safety Management Systems, Solar Photovoltaic Modules, Industrial control panels and assemblies, Photovoltaic Cable, Fuel Cells, Wind Turbines, Distribution transformers, Outlet Boxes, and Wiring Fittings Hardware and Positioning Devices.<\/em>[\/vc_column_text][vc_separator color=\u00a0\u00bbblack\u00a0\u00bb border_width=\u00a0\u00bb2&Prime;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><div class=\"frm_forms  with_frm_style frm_style_formidable-style\" id=\"frm_form_10_container\" data-token=\"177ebbff072d80236ba0af8e768a701b\">\n<form enctype=\"multipart\/form-data\" method=\"post\" class=\"frm-show-form  frm_js_validate  frm_ajax_submit  frm_pro_form  frm_ajax_submit \" id=\"form_ratethisarticle34d793dfaca6666cc3158548ad3daa\" data-token=\"177ebbff072d80236ba0af8e768a701b\">\n<div class=\"frm_form_fields \">\n<fieldset>\n<legend class=\"frm_screen_reader\">Rate this article.ca - 2021 Changes In The Canadian Electrical Code: Table 19<\/legend>\r\n\r\n<div class=\"frm_fields_container\">\n<input type=\"hidden\" name=\"frm_action\" value=\"create\" \/>\n<input type=\"hidden\" name=\"form_id\" value=\"10\" \/>\n<input type=\"hidden\" name=\"frm_hide_fields_10\" id=\"frm_hide_fields_10\" value=\"\" \/>\n<input type=\"hidden\" name=\"form_key\" value=\"ratethisarticle34d793dfaca6666cc3158548ad3daa\" \/>\n<input type=\"hidden\" name=\"item_meta[0]\" value=\"\" \/>\n<input type=\"hidden\" id=\"frm_submit_entry_10\" name=\"frm_submit_entry_10\" value=\"4e46689b11\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/fr\/wp-json\/wp\/v2\/pages\/16158\" \/><div id=\"frm_field_267_container\" class=\"frm_form_field form-field  frm_top_container\">\r\n    <label for=\"field_4yvt92d2ea24c59fd27d0797780d90ed0ab\" id=\"field_4yvt92d2ea24c59fd27d0797780d90ed0ab_label\" class=\"frm_primary_label\">Please rate:\r\n        <span class=\"frm_required\" aria-hidden=\"true\"><\/span>\r\n    <\/label>\r\n    <input type=\"text\" id=\"field_4yvt92d2ea24c59fd27d0797780d90ed0ab\" name=\"item_meta[267]\" value=\"2021 Changes In The Canadian Electrical Code: Table 19\"  readonly=\"readonly\"  data-frmval=\"2021 Changes In The Canadian Electrical Code: Table 19\" data-invmsg=\"Text is invalid\" aria-invalid=\"false\"  \/>\r\n    \r\n    \r\n<\/div>\n<div id=\"frm_field_268_container\" class=\"frm_form_field form-field  frm_required_field frm_top_container\">\r\n    <label for=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48\" id=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48_label\" class=\"frm_primary_label\">Star Rating\r\n        <span class=\"frm_required\" aria-hidden=\"true\">*<\/span>\r\n    <\/label>\r\n    <div class=\"frm_opt_container\" aria-labelledby=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48_label\" role=\"group\"><div class=\"frm-star-group\">\n\t\t<input type=\"radio\" name=\"item_meta[268]\" id=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-0\" value=\"1\"  data-reqmsg=\"Star Rating cannot be blank.\" aria-required=\"true\" data-invmsg=\"Star Rating est non valide\" aria-invalid=\"false\"   \/><label for=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-0\" class=\"star-rating\"><span class=\"frm_screen_reader\">1 Star<\/span><\/label>\n\t\t<input type=\"radio\" name=\"item_meta[268]\" id=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-1\" value=\"2\"  data-reqmsg=\"Star Rating cannot be blank.\" aria-required=\"true\" data-invmsg=\"Star Rating est non valide\" aria-invalid=\"false\"   \/><label for=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-1\" class=\"star-rating\"><span class=\"frm_screen_reader\">2 Stars<\/span><\/label>\n\t\t<input type=\"radio\" name=\"item_meta[268]\" id=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-2\" value=\"3\"  data-reqmsg=\"Star Rating cannot be blank.\" aria-required=\"true\" data-invmsg=\"Star Rating est non valide\" aria-invalid=\"false\"   \/><label for=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-2\" class=\"star-rating\"><span class=\"frm_screen_reader\">3 Stars<\/span><\/label>\n\t\t<input type=\"radio\" name=\"item_meta[268]\" id=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-3\" value=\"4\"  data-reqmsg=\"Star Rating cannot be blank.\" aria-required=\"true\" data-invmsg=\"Star Rating est non valide\" aria-invalid=\"false\"   \/><label for=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-3\" class=\"star-rating\"><span class=\"frm_screen_reader\">4 Stars<\/span><\/label>\n\t\t<input type=\"radio\" name=\"item_meta[268]\" id=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-4\" value=\"5\"  data-reqmsg=\"Star Rating cannot be blank.\" aria-required=\"true\" data-invmsg=\"Star Rating est non valide\" aria-invalid=\"false\"   \/><label for=\"field_njp3z7dc7e159e86e2b08d3dfea632c8b48-4\" class=\"star-rating\"><span class=\"frm_screen_reader\">5 Stars<\/span><\/label>\n<div style=\"clear:both;\"><\/div>\n<\/div>\n<\/div>\r\n    \r\n    \r\n<\/div>\n<div id=\"frm_field_269_container\" class=\"frm_form_field form-field  frm_top_container\">\r\n    <label for=\"field_zran475865d7a16cae3f3580afe89d3101f\" id=\"field_zran475865d7a16cae3f3580afe89d3101f_label\" class=\"frm_primary_label\">Comments (Optional):\r\n        <span class=\"frm_required\" aria-hidden=\"true\"><\/span>\r\n    <\/label>\r\n    <input type=\"text\" id=\"field_zran475865d7a16cae3f3580afe89d3101f\" name=\"item_meta[269]\" value=\"\"  maxlength=\"250\" data-invmsg=\"Text is invalid\" aria-invalid=\"false\"  \/>\r\n    \r\n    \r\n<\/div>\n<div id=\"frm_field_270_container\" class=\"frm_form_field form-field  frm_none_container\">\r\n    <label for=\"g-recaptcha-response\" id=\"field_p5mfbb684fd2944cce9d9381_label\" class=\"frm_primary_label\">reCAPTCHA\r\n        <span class=\"frm_required\" aria-hidden=\"true\"><\/span>\r\n    <\/label>\r\n    <div  id=\"field_p5mfbb684fd2944cce9d9381\" class=\"g-recaptcha\" data-sitekey=\"6LeCXW4bAAAAAFEDr4PCnTS0mL3pH0eBKdfd9Vje\" data-size=\"normal\" data-theme=\"light\"><\/div>\r\n    \r\n    \r\n<\/div>\n\t<input type=\"hidden\" name=\"item_key\" value=\"\" \/>\n\t\t\t<div id=\"frm_field_616_container\">\n\t\t\t<label for=\"field_364am\" >\n\t\t\t\tSi vous \u00eates un humain, ne remplissez pas ce champ.\t\t\t<\/label>\n\t\t\t<input  id=\"field_364am\" type=\"text\" class=\"frm_form_field form-field frm_verify\" name=\"item_meta[616]\" value=\"\"  \/>\n\t\t<\/div>\n\t\t<input name=\"frm_state\" type=\"hidden\" value=\"hgzanLOmx4ScyEM26qieugLf7hcuPoqPUMnYAh\/VBf0=\" \/><div class=\"frm_submit\">\r\n\r\n<button class=\"frm_button_submit frm_final_submit\" type=\"submit\"  >Submit<\/button>\r\n\r\n<\/div><\/div>\n<\/fieldset>\n<\/div>\n\n<\/form>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=\u00a0\u00bbblack\u00a0\u00bb border_width=\u00a0\u00bb2&Prime;][vc_column_text]<figure id=\"attachment_16133\" aria-describedby=\"caption-attachment-16133\" style=\"width: 200px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.electrofed.com\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16133 size-full\" src=\"https:\/\/www.qps.ca\/wp-content\/uploads\/2021\/06\/MEMBER_ENG_200x160.jpg\" alt=\"\" width=\"200\" height=\"160\" \/><\/a><figcaption id=\"caption-attachment-16133\" class=\"wp-caption-text\">This article was first published on EFC&rsquo;s website.<\/figcaption><\/figure><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h6><\/h6>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text][vc_row][vc_column][vc_column_text] Changes in the 2021 Canadian Electrical Code Part I (CE Code) &#8211; By Steve Douglas This is the second of a series of articles detailing significant changes for the 2021 Canadian Electrical Code Part I (CE Code) that may impact electrical equipment manufacturers. A full copy of the CE Code is available at https:\/\/www.csagroup.org\/store\/ &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.qps.ca\/fr\/table-19\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> \u00ab\u00a0(English) 2021 Changes In The Canadian Electrical Code: Table 19\u00a0\u00bb<\/span><\/a><\/p>\n","protected":false},"author":19,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-16158","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title><\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qps.ca\/fr\/table-19\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"[:en]2021 Changes In The Canadian Electrical Code: Table 19[:] - Applus+ QPS\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text][vc_row][vc_column][vc_column_text] Changes in the 2021 Canadian Electrical Code Part I (CE Code) &#8211; By Steve Douglas This is the second of a series of articles detailing significant changes for the 2021 Canadian Electrical Code Part I (CE Code) that may impact electrical equipment manufacturers. A full copy of the CE Code is available at https:\/\/www.csagroup.org\/store\/ &hellip; Continue reading &quot;(English) 2021 Changes In The Canadian Electrical Code: Table 19&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qps.ca\/fr\/table-19\/\" \/>\n<meta property=\"og:site_name\" content=\"Applus+ QPS\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-13T19:50:15+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qps.ca\/fr\/table-19\/\",\"url\":\"https:\/\/www.qps.ca\/fr\/table-19\/\",\"name\":\"[:en]2021 Changes In The Canadian Electrical Code: Table 19[:] - Applus+ QPS\",\"isPartOf\":{\"@id\":\"https:\/\/www.qps.ca\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.qps.ca\/fr\/table-19\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.qps.ca\/fr\/table-19\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png\",\"datePublished\":\"2021-06-04T21:09:36+00:00\",\"dateModified\":\"2021-09-13T19:50:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.qps.ca\/fr\/table-19\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qps.ca\/fr\/table-19\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.qps.ca\/fr\/table-19\/#primaryimage\",\"url\":\"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png\",\"contentUrl\":\"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.qps.ca\/fr\/table-19\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.qps.ca\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"(English) 2021 Changes In The Canadian Electrical Code: Table 19\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qps.ca\/#website\",\"url\":\"https:\/\/www.qps.ca\/\",\"name\":\"QPS Evaluation Services\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.qps.ca\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qps.ca\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.qps.ca\/#organization\",\"name\":\"QPS Evaluation Services Inc.\",\"url\":\"https:\/\/www.qps.ca\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.qps.ca\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.qps.ca\/wp-content\/uploads\/2019\/07\/QPS_ColorLogo.png\",\"contentUrl\":\"https:\/\/www.qps.ca\/wp-content\/uploads\/2019\/07\/QPS_ColorLogo.png\",\"width\":177,\"height\":105,\"caption\":\"QPS Evaluation Services Inc.\"},\"image\":{\"@id\":\"https:\/\/www.qps.ca\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"[:en]2021 Changes In The Canadian Electrical Code: Table 19[:] - Applus+ QPS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qps.ca\/fr\/table-19\/","og_locale":"fr_FR","og_type":"article","og_title":"[:en]2021 Changes In The Canadian Electrical Code: Table 19[:] - Applus+ QPS","og_description":"[vc_row][vc_column][vc_column_text][vc_row][vc_column][vc_column_text] Changes in the 2021 Canadian Electrical Code Part I (CE Code) &#8211; By Steve Douglas This is the second of a series of articles detailing significant changes for the 2021 Canadian Electrical Code Part I (CE Code) that may impact electrical equipment manufacturers. A full copy of the CE Code is available at https:\/\/www.csagroup.org\/store\/ &hellip; Continue reading \"(English) 2021 Changes In The Canadian Electrical Code: Table 19\"","og_url":"https:\/\/www.qps.ca\/fr\/table-19\/","og_site_name":"Applus+ QPS","article_modified_time":"2021-09-13T19:50:15+00:00","og_image":[{"url":"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.qps.ca\/fr\/table-19\/","url":"https:\/\/www.qps.ca\/fr\/table-19\/","name":"[:en]2021 Changes In The Canadian Electrical Code: Table 19[:] - Applus+ QPS","isPartOf":{"@id":"https:\/\/www.qps.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.qps.ca\/fr\/table-19\/#primaryimage"},"image":{"@id":"https:\/\/www.qps.ca\/fr\/table-19\/#primaryimage"},"thumbnailUrl":"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png","datePublished":"2021-06-04T21:09:36+00:00","dateModified":"2021-09-13T19:50:15+00:00","breadcrumb":{"@id":"https:\/\/www.qps.ca\/fr\/table-19\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qps.ca\/fr\/table-19\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.qps.ca\/fr\/table-19\/#primaryimage","url":"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png","contentUrl":"http:\/\/qpsamerica.com\/wp-content\/uploads\/2021\/06\/Table-19-image-1024x637.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.qps.ca\/fr\/table-19\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.qps.ca\/"},{"@type":"ListItem","position":2,"name":"(English) 2021 Changes In The Canadian Electrical Code: Table 19"}]},{"@type":"WebSite","@id":"https:\/\/www.qps.ca\/#website","url":"https:\/\/www.qps.ca\/","name":"QPS Evaluation Services","description":"","publisher":{"@id":"https:\/\/www.qps.ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qps.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.qps.ca\/#organization","name":"QPS Evaluation Services Inc.","url":"https:\/\/www.qps.ca\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.qps.ca\/#\/schema\/logo\/image\/","url":"https:\/\/www.qps.ca\/wp-content\/uploads\/2019\/07\/QPS_ColorLogo.png","contentUrl":"https:\/\/www.qps.ca\/wp-content\/uploads\/2019\/07\/QPS_ColorLogo.png","width":177,"height":105,"caption":"QPS Evaluation Services Inc."},"image":{"@id":"https:\/\/www.qps.ca\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/pages\/16158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/comments?post=16158"}],"version-history":[{"count":11,"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/pages\/16158\/revisions"}],"predecessor-version":[{"id":17001,"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/pages\/16158\/revisions\/17001"}],"wp:attachment":[{"href":"https:\/\/www.qps.ca\/fr\/wp-json\/wp\/v2\/media?parent=16158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}